Divi Clinic Layouts

Dolore funiat nulla
sariatur encek

The Company Projects History

 

The pioneer years

Our history begins in 1995 as the company was known as Give and Take Enterprise when the company begun its operation. Palmers Green International Limited was registered as a limited liability company under the Company’s Act, 1963 (Act 179) in the year 2005

 

Highlights

 

1999
Supply and installation of 10MVA generating set.  – (  Ministry of Defense )

2004
Supply of overhead line materials – (  Ministry of Energy ) 

2005
 – Supply of overhead electrical materials for Rural electrification project – (  Ministry of Energy:  Luton Project Subcontracted to PGIL
 – Supply of overhead electrical materials for Rural electrification project – (  Ministry of Energy: British Engineering Ltd. Subcontracted to PGIL )

2008
– Supply of substation spares and auxiliary equipment – (  E.C.G: :  Luton Project Subcontracted to PGIL ) 
 – Supply and installation of 33KV 2×20/26MVA, 33/11KV indoor GIS substation – (  E.C.G: :  Luton Project Subcontracted to PGIL ) 
 – Supply of Transformers – (  E.C.G: :  Luton Project Subcontracted to PGIL ) 
 – Supply and installation of 33KV outdoor switchgear equipment – (  E.C.G: :  Luton Project Subcontracted to PGIL ) 

 

Highlights

 

  • Upgrading of primary stations A,C,D,E,K,M,Q,S & Z in Accra and in Akwapim Mampong- (  ECG:  Luton Project Subcontracted to PGIL)
  • Rehabilitation and upgrading of both high and low tensions and redesigning of overhead and underground electrical cable distribution network  – (  Ministry of Defense 66 Artillery Regiment:  Luton Project Subcontracted to PGIL)
  • Rehabilitation and upgrading of both high and low tensions and redesigning of overhead and underground electrical cable distribution network – ( Ministry of Defense Tanokrom & Kwekuma:  Luton Project Subcontracted to PGIL)
  • Rehabilitation and upgrading of both high and low tensions and redesigning of overhead and underground electrical cable distribution network. – ( Ministry of Defense 3BN & Reece:  Luton Project Subcontracted to PGIL)

 

Highlights

 

  • Upgrading of Primary Station ‘A’ and ‘C’ in Kumasi – (  ECG:  Luton Project Subcontracted to PGIL)
  • Construction of 2X40MVA & 2X60MVA 33kV Double Circuit Tower Lines to Interconnect Primary and Switching Stations in the Central, Eastern and Ashanti Regions- (  ECG:  Luton Project Subcontracted to PGIL)
  • Construction of Additional 33KV Bays at Cape Coast BSP and Construction of One Storey Control Room With Scada Office – (  ECG:  Luton Project Subcontracted to PGIL)
  • Supply of 11No 20/26MVA 33/11kV Power Transformer – (  ECG:  Luton Project Subcontracted to PGIL)
  • Supply and Installation of Nine (9) 33KV INDOOR AIS Tamco Switchgear For Tema Stations ‘A’, ‘D’, and ‘E’- (  ECG:  Luton Project Subcontracted to PGIL)

 

Highlights

 

  • Construction of Warehouse,District Office Block, Workshop and External Works at Accra
    West Region Yard – (  ECG:  Luton Project Subcontracted to PGIL)
  • Construction of Warehouse, Office Block, Workshop and External Works at Cape Coast- (  ECG:  Luton Project Subcontracted to PGIL)
  • Construction of Warehouse, Office Block, Workshop and External Works at Boadi,
    Kumasi  – (  ECG:  Luton Project Subcontracted to PGIL)
  • Upgrading Of Primary Station ‘H’ In Accra, ‘B’ and ‘D’ in Kumasi and Switching Station at Kuntunase – (  ECG:  Luton Project Subcontracted to PGIL)
  • Supply and Installation of 11KV Indoor Tamco Switchgear for Tema Stations ‘A’,& ‘D’ – (  ECG:  Luton Project Subcontracted to PGIL)
  • Installation of Plant, Equipment and Mandatory Spares Supplied from Abroad for the Construction of 2x40MVA 33KV Double Circuit Tower Line from the Takoradi Station “B” to Takoradi “D” – (  ECG:  Luton Project Subcontracted to PGIL)

 

Highlights

 

  • Construction of Warehouse Office Block, Workshop and External Works at Koforidua- (  ECG:  Luton Project Subcontracted to PGIL)
  • Upgrading Of Bulk Supply Point At Mallam – (  ECG:  Luton Project Subcontracted to PGIL)
  • Upgrading Of Primary Station ‘Y’ Baatsona, Accra   – (  ECG:  Luton Project Subcontracted to PGIL)
  • Upgrading Of Primary Station ‘T’ Adenta, Accra   – (  ECG:  Luton Project Subcontracted to PGIL)
  • Sub-transmission Improvement Projects in Ashanti Region (Phase I) – (  ECG:  Luton Project Subcontracted to PGIL)
  • Sub-transmission Improvement Projects In Ashanti Region (Phase II) – (  ECG:  Luton Project Subcontracted to PGIL)
  • Supply and Installation of substation equipment (  ECG )

 

Highlights

 

  • Supply of 150 LED Street Lighting Fixtures Complete- (  ECG )
  • Supply of Steel Tubular Poles (  ECG )

 

Highlights

 

  • Supply of Pole-Top Accessories and Conductors- (  ECG )

 

Highlights

 

  • Supply of Stay Equipment and Stay Wire- (  ECG )
  • Supply and Installation of Protection Equipment (  ECG )
  • Purchase of Bimetallic Cable Lugs (  ECG )

 

Highlights

  • Supply of Stay Equipment And Stay Wire – (  ECG )
  • Construction of Second Tarkwa 2x20MVA Primary Substation – (  ECG )
  • 33KV Autoclosers – (  ECG )
  • Supply Of Substation Protection Control Equipment (  ECG )
  •  

 

Highlights

 

  • Supply Of Distribution Materials Under Electricity Intensification 31 project – (  ECG )
  • Reconstruction and Expansion of the Obuasi BSP – (  ECG )
  • Reconstruction and Expansion of the Nsuta Primary Substation – (  ECG )
  • 33KV Autoclosers (  ECG )
  • Purchase of HRC Fuse  (  ECG )

 

Highlights

 

  • Supply Of 20MVA Power Transformer – (  Substation – Latebiokoshie )
  • Supply Of 20MVA Power Transformers – (  Substation – Labadi )
  • Supply Of 20MVA Power Transformers – (  Substation – Trassaco )
  • Installation of Tower Lines – (  Capecoast to Assin Fosu )
  • Construction of ECG Office (  ECG – Koforidua )
  • Construction of ECG Warehouse(  ECG – Koforidua )
  • Purchase of HRC Fuse  (  ECG )

 

Highlights

 

  • Tarkwa ECG Substation Project
  • Obuasi ECG Substation Project
  • KETA ECG Substation Project